"Save Earth, It Saves You."
BEE-certified energy, electrical-safety, fire-safety and power-quality audits for factories, warehouses and commercial buildings across Telangana & Andhra Pradesh β with ROI-ranked recommendations you can act on.
Telangana DISCOMs bill on KVAh β poor PF is a silent surcharge on every unit.
Poor β Power Factor β Unity (1.0)
Comprehensive audit and compliance services for factories, warehouses, commercial buildings and residential complexes β delivered and signed by a BEE-certified auditor & Chartered Engineer.
Detailed consumption analysis per BEE guidelines & EC Act 2001. Equipment-level analysis, load profiling and DPR β typically unlocking 10β30% savings.
HIRA, workplace safety compliance aligned with ISO 45001, Factories Act and OISD norms β including fire safety, emergency preparedness and PPE audits.
PF, harmonics, unbalance and reactive power assessment. APFC and capacitor bank design to reach unity PF and eliminate KVAh-billing penalties.
Energy Conservation Building Code assessment covering envelope, HVAC, lighting and SHW. Mandatory for buildings >500 sqm in notified states.
ESG baseline, materiality mapping and sustainability reports aligned with GRI, BRSR (SEBI) and CDP β by a NISM & CRISIL certified ESG analyst.
HT/LT panels, transformers, earthing, switchgear and cabling inspected against IE Act, NBC and NFPA β with thermography and IR testing.
Pre-acquisition or pre-lease assessment of buildings and industrial facilities β structural, MEP and compliance status for investors and tenants.
Handover/Takeover of buildings, MEP systems and facilities β compliant, documented, defect-noted condition with snag lists and verification.
OEE, maintenance practice and utility system assessment β compressed air, cooling towers, boilers β benchmarked to industry best practice.
TSSPDCL & TSNPDCL bill HT and LT industrial consumers on KVAh β not KWh. Every unit of reactive power is added to your bill, and low-PF consumers attract KVARH penalty charges on top.
| Power Factor | KVA (100 KW load) | Bill Impact | Status |
|---|---|---|---|
| 1.00 (Unity) | 100 KVA | Baseline β no penalty | β IDEAL |
| 0.95 | 105 KVA | +5% higher bill | β GOOD |
| 0.90 | 111 KVA | +11% higher bill | β ACCEPTABLE |
| 0.85 | 118 KVA | +18% higher bill | β POOR |
| 0.80 | 125 KVA | +25% + KVARH charges | β VERY POOR |
| 0.70 or below | 143+ KVA | +43% + heavy penalties | β CRITICAL |
Structured methodology, no surprises β and support that continues after the report is delivered.
Facility, utility bills and concerns understood. No-cost 30-minute call.
Bills, equipment lists, drawings, past reports and energy records.
Inspection, measurements, PQ logging and photo documentation.
Energy & cost analysis with ROI-ranked recommendations.
Findings presented to management with an implementation roadmap.
Vendor guidance, supervision and post-implementation verification.
Managing Partner Β· Itihas Engineering Services
23+ years across energy management, facility operations and statutory compliance β earlier career with CBRE, JLL, Sodexo and Wipro Eco Energy, managing Fortune 500 pharma, telecom and IT facilities.
Every audit is performed and signed by a certified professional who has run the very facilities being audited β LEED Platinum operations, cyclone-recovery crisis response, and 3,500+ pump installations under India's AgDSM programme.
Practical guidance on energy efficiency, safety compliance and sustainability.
A factory at PF 0.80 pays 25% more than one at unity β for the same work done. How APFC panels recover this cost.
Motors, compressed air, lighting, HVAC and furnaces are 75% of factory consumption. Where the 10β30% hides.
SEBI's BRSR for the top 1000 listed companies β material topics, Scope 1/2/3 and supply-chain disclosures.
Worker participation, context of organisation and risk-opportunity thinking β a practical gap analysis.
VFDs and non-linear loads inject harmonics that overheat transformers and trip breakers. Diagnose before it costs.
Envelope U-values, HVAC COP, lighting LPD and SHW for buildings above 500 sqm β what builders need to know.
No-obligation quote for your facility audit. We respond within 24 hours.
Kukatpally, Hyderabad, Telangana
Serving Pan-Telangana & Andhra Pradesh
MonβSat: 9:00 AM β 6:00 PM
Sunday: By appointment